Project Description: Project was to install lime kiln and recausticizing at an existing mill.
NHWL Responsibilities: NHWL was responsible for general arrangement of the facility, foundation layouts and loads, layouts and main beam sizing of steel for platforms, support structures & pipe racks, pipe design, design of chute and ducts and instrumentation design. NHWL also provided detailed bill of materials for purchase of construction materials and supplied construction oversight of piping and instrumentation systems. Instrumentation design included system logic and sequence diagrams.